Case Study - Data Centre

Telecity Powergate

 100 New Oxford Street

 

•Data Centre BMS system
•Provision of BMS hardware & software engineering for monitoring and management of the following systems:
•Cooling (8 x Chillers and associated pumps)
•Ventilation - AHUs
•CRAC (Computer Room Air Conditioning) Units communication with the BMS via Modbus
•Metering via Modbus
•Generator, UPS, ATS, Temperature &

 

We provided a Trend BMS system (IQ3) for the monitoring and control of the above services. Working on behalf of the mechanical contractor we ensured that the BMS installation and subsequent commissioning was undertaken within the timescales provided. IST and Black Building testing was undertaken with the Trend system being benchmarked for operation. Heat-Bank testing was included within the testing with the BMS recording the performance of the CRAC units and associated chilled water and ventilation systems.